The Kalpasar Project envisages building a dam across the Gulf of Khambat for generating tidal power and for establishing a huge reservoir for fresh water for irrigation, drinking and industrial purposes. A 10 lane road link will also be set up over the dam, greatly reducing the distance between Saurashtra and South Gujarat.
Contents |
The Gulf of Khambhat was identified as a promising site for tidal power generation by UNDP Expert, Mr. Eric Wilson in the year 1975. In 1988-89 a reconnaissance report was prepared for the dam across the Gulf of Khambhat. The report concluded that, assuming sound foundation conditions, the closure of the Gulf was technically feasible.
In January 2002, it was reported that construction will begin in 2011.[1]
A state government release said the Rs 55,000 crore (US$ 11.7 billion) project, to be completed by 2020, will have a vast fresh water reservoir with gross storage of 16,791 million cubic metres of water, 35 km long dam across the Gulf of Khambhat connecting Ghogha in Bhavnagar with Hansot in Bharuch District, reducing the distance between the two by 225 km. It will have tidal power generation house with an installed capacity of 5,880 MW. Another estimate was given by the Government in October, 2010 which stated the proposed dam to be build just north of Bhavnagar in the west to Alandar in Dahej on the east. [2]
The Kalpasar project of the Gujarat government, which envisages building of dam over the Gulf of Khambhat to establish huge reservoir, will commence in 2012, a year later than expected.
M S Patel, Secretary Kalpasar project, Government of Gujarat, said: “The project has been put on the fast track and will commence by 2012. It will take around seven years to complete it.”
In 2008, B N Navalawala, advisor to Chief Minister Narendra Modi, had said the project would be launched by 2010-11. The new announcement was made while Patel was addressing a workshop on groundwater management in the coastal areas of Gujarat.
The alignment of kalpsar has been changed towards north between Kalatalao, Bhavnagar to Aladar, Dahej near Bharuch. Idea of tidal power project is dropped. Only fresh water reservoir is proposed. Narmada river is excluded but its water will be diverted to kalpsar by constructing a check dam near Bhadbhut,Bharuch; with an about 30 km long, one lac cusacs canal off taking from it to kalpsar. Plan of fresh water distribution is changed and now focused to Saurashtra.
As per a report published on 20 December 2011, in the newspaper The Times Of India, the commencement has been further pushed to year 2013 [3]
Gujarat Govt. has requested for TOR to MoEF, but MoEF has asked to present more documents as it was highly inadequate & also PFR, CRZ clearance from State.